Change Language :
In Thyssen Krupp's Duisburg hot rolling mill, a slab transport crane from BANG Kransysteme GmbH & Co. KG is responsible for handling the slabs at the interface between the steelworks and the rolling mill - in heat and dust. The supply of energy and signals to the trolley and cab is ensured by heavy-duty igus energy chains supplied pre-assembled as basic readychain systems.

Tech up ... Reduce costs.
In this igus® magazine you will find numerous possibilities and application examples of how you can reduce tech up and / or costs with ready-to-install energy chain systems.

In person:
Monday to Friday from 09:00 - 17:00
Online:
24h